POLITICS● LOWSep 8 · Sep 8, 2026, 9:59 AM
Approach NGT with plea on installation of FGD systems in thermal power plants: Supreme Court to petitioner
The Hindu · south asia
The petitioner’s counsel argued that the timeline for complying with the mandate to install flue gas desulphurisation systems in thermal power plants has been extended from time to time, and people are facing health hazards due to pollution
GlobeAlert aggregates and classifies open sources; the story above belongs to its publisher. Summaries are machine-generated from the source text.
More in Politics
POLITICS16m agoBJP questions Minister Rajmohan’s claim of bribery for Tamil Nadu Iyal Isai Nataka Mandram chairman postThe HinduPOLITICS21m agoWhat's on the line for health care in the midtermsAxiosPOLITICS22m agoMandal Agriculture Officer in Telangana’s Sangareddy caught accepting ₹20,000 bribeThe HinduPOLITICS22m agoSpanish police dismantle Madrid housing protest camp ahead of snap electionSouth China Morning Post