WORLD● LOWSep 4 · Sep 4, 2026, 1:54 AM
Flyover to cut down travel time by 30 minutes
The Hindu · south asia
With the main viaduct 2.53 kilometres long and 16.61 metres wide with four lanes, the structure takes off from Nalgonda Crossroads, flies over the Chanchalguda, Saidabad and IS Sadan junctions, to land at Champapet
GlobeAlert aggregates and classifies open sources; the story above belongs to its publisher. Summaries are machine-generated from the source text.
More in World
WORLD29m agoPeter Jackson reveals Tintin sequel will be his next filmflickeringmyth.com · United StatesWORLD29m agoNothing left to loot : Parisians ponder the real cost of another night of riotssmh.com.au · AustraliaWORLD29m agoGunman on the run arrested after stolen car torchedcrookwellgazette.com.au · AustraliaWORLD29m agoGunman on the run arrested after stolen car torchedportstephensexaminer.com.au · Australia